Mahr
Mahr
Case Study: Custom Gaging Solution for Oil Well Pump Barrels
EN-US

A manufacturer of sub-surface oil well pump barrels needed a better way to check the inside of their barrels for wear. The barrels, some up to 30 feet (14 meters) long, must be periodically removed from the well and checked for excessive wear due to constant plunger motion.

Click on the PDF below to read about the MarSolution for this application.

 

PDF-File (case_study--marsolutions_oil_well_pump_barrels--en.pdf)
Custom Gaging Solution for Oil Well Pump Barrels 
Date: 2016-06-08
Version : 2016/06